Confirmed Case of COVID-19

We have today (Fri 23 Oct 2020) been informed of a confirmed case of COVID-19. All parents have been emailed a letter explaining the situation and our response. Please check your email or click here to view the letter sent to the whole school.

The students who have been identified as having been in close contact should self-isolate and return to school on Wednesday 4th November 2020 which is 14 days after the last contact, which was Tuesday 20th October 2020.


Close this announcement
HAYGROVE SCHOOL
Image

Image

Image

Image

Image

New School Premises on the Horizon

Haygrove School and the Department for Education appointed contractor, Caledonian Modular, are pleased to report that the opening of the new premises is now in sight.

The three-story building will become the main premises of the school, housing both teaching facilities and offices for staff. The top floor will be home to eight purpose built science teaching rooms. The Science Department has recently benefited from the Hinkley Connection Project Education Fund which will help to equip the new space with additional resources.

English and Modern Foreign Language teaching will move into the eleven bright and airy classrooms on the first floor; and on the ground floor, a new reception area will welcome visitors and provide offices for leadership and support staff. Changing rooms for students to use when getting ready for PE lessons are part of the new facilities, alongside ample toilet facilities on each floor. The building is 100% compliant with regulations regarding access for people with a disability and has been designed to be environmentally efficient.

A large dining hall and kitchen facilities will form part of the ground floor, so, for the first time, students at Haygrove School will benefit from a dedicated dining space. To the side of the main modular structure, and built using traditional steel-frame building techniques, is a new school hall which will have retractable ‘bleacher’ seating installed to enable performances to take place in a ‘theatre-style’ setting, and an additional activity room that will be home to a fitness suite furnished with a range of gym equipment.

Head teacher, Mr Reid says, “The impact of the new building on the day to day experience of our students cannot be underestimated. The new classrooms are fantastic and so spacious, and it will be wonderful for our school to have a separate, dedicated dining facility as well as a brand new hall where we can gather our students together for assembly. I am excited about the creative opportunities that will arise with a new, purpose-built room for our dance and drama lessons to take place. There can be little doubt that this fabulous new building will transform the teaching and learning environment for our students. We had hoped for the move to take place during the final two weeks of the summer term, but the impact of the current pandemic, which has often made procuring materials challenging, along with lots of very windy weather means that a new timetable for moving is in the process of being agreed by the Department for Education. Parents will be notified before the end of the term when the move will be taking place.”

Mr Barrie Newman,  Caledonian Project Director stated ‘Caledonian are very pleased to be undertaking this full turnkey scheme directly for the DfE to provide new modern state of the art facilities for Haygrove School.’  

HOW TO CONTACT US
By Post
HAYGROVE SCHOOL Durleigh Road Bridgwater Somerset TA6 7HW
By Phone
01278 455531
By Email
Please use our Online Enquiry Form to get in touch.
© HAYGROVE SCHOOL
Website Designed by Think! and built by WebDesignUK