Planning for Partial School Opening

In line with Government guidelines we are working with parents of Year 10 students and our staff to develop and implement safe strategies to extend school provision to Year 10 students along with children of key workers from June 15th . As soon as our school plan is agreed it will be published to all parents.

Please click here to read a letter from Mrs Canham regarding the reopening of schools within the Quantock Education Trust.

_____________________________________________________________________________________

We have today issued a new Home Schooling Timetable to help our Year 7,8 and 9 students plan their home learning.

Don't forget you can click here to access a range of resources to help with home schooling

_____________________________________________________________________________________

If you are a key worker and require childcare for your son or daughter at Haygrove School because you have no other safe childcare provision, please email key@haygrove.somerset.sch.uk stating your child’s name, registration group, parent's name, parent's occupation and the days/times you intend to send your child to school.

Close this announcement
HAYGROVE SCHOOL
Image

New School Build Sept Oct 2019

The view from the rear of the school buildings has changed quite a bit over the past half term. Since the summer holidays Caledonian Modular and their sub-contractors have been preparing the ground for our new school building which should be ready to move into in 2020. 

The majority of the new building is of a modular construction and has already been built at Caledonian's factory in Neward. Executive Headteacher Mrs Canham and Business Manager Mrs Lee have visited the premises and already stood in many of the classrooms and offices that will, over the coming months, be carefully transported on huge lorries to Bridgwater.

One section of the building is of tradition steel-frame construction due to the ceiling height required for the larger school spaces such as the main hall. The modular section will be three stories high with the top floor housing eight purpose-built science labs and a prep-room. The new school will also contain a mirrored-wall activity studio, a drama studio and a dedicated dining hall. The main hall will house bleecher seating controlled by the press of a button. Haygrove students will no longer have to stay behine after assembly to stack the chairs away neatly!

Outside, new tennis courts will be sited at the front of the building with a new access path leading up to the main entrance alongside. At the back, the exisitng rugby pitches and hockey surface will remain and be complimented by a new athletics track and football pitch. 

Photo Gallery

Find out more about Calendonain Modular

HOW TO CONTACT US
By Post
HAYGROVE SCHOOL Durleigh Road Bridgwater Somerset TA6 7HW
By Phone
01278 455531
By Email
Please use our Online Enquiry Form to get in touch.
© HAYGROVE SCHOOL
Website Designed by Think! and built by WebDesignUK